![FP-Black Oak](https://as-engineers.com/wp-content/uploads/2022/01/FP-Black-Oak-1.jpg)
The development consists of water, sanitary sewer, storm sewer, paving, and bridges to serve approximately 105 lots within Black Oak Section 1 including detention ponds and lift stations.
![FP-El Dorado](https://as-engineers.com/wp-content/uploads/2022/01/FP-El-Dorado.jpg)
The project consists of design and construction of replacement the 0.50 MGD El Dorado Utility District Wastewater Treatment Plant including an elevated headworks with mechanical fine screen, aeration basins, clarifiers, a chlorine contact basin, building for the motor control center, chemical feed system, and multi-stage centrifugal blowers. Also, the scope includes converting the existing aeration basin and chlorine contact basin to a digester, new electrical service, site work, detention pond and site grading, storm sewer and outfall, plant piping, protective coatings, paving, electrical duct banks, conduit, and wiring.
![FP-Harris County](https://as-engineers.com/wp-content/uploads/2022/01/FP-Harris-County.jpg)
The Project consisted of the rehabilitation of approximately 45,000 linear feet of 12-inch, 8-inch, 6-inch, and 4-inch water line using “in-situ” replacement with pre-chlorinated pipe bursting method, including replacement of water valves, fire hydrants and service connections.