The Project consisted of the rehabilitation of approximately 45,000 linear feet of 12-inch, 8-inch, 6-inch, and 4-inch water line using “in-situ” replacement with pre-chlorinated pipe bursting method, including replacement of
The project consists of design and construction of replacement the 0.50 MGD El Dorado Utility District Wastewater Treatment Plant including an elevated headworks with mechanical fine screen, aeration basins, clarifiers,
The development consists of water, sanitary sewer, storm sewer, paving, and bridges to serve approximately 105 lots within Black Oak Section 1 including detention ponds and lift stations.